Here, we installed a single-ply Sika Sarnafil 60-mil mechanically attached PVC with 24 gauge coping, LASTOBOND peel and stick underlayment, and an AEP Box Rib metal roofing with associated siding and flashing.
Read MoreWe used mechanically attached single-ply TPO over ¼ inch secure rock with a 20 year labor-and-materials warranty and a new Kynar 24 gauge with ANSI Clete. In total, this project was 120,000 square feet.
Read MoreCorning’s Maywood Middle School called for removal of the existing hail damaged, twenty-year-old PVC roof. We applied a new 60-mil PVC roof with a 20 year labor-and-materials warranty.
Read MoreWe tore off an EPDM roof, replaced damaged and wet insulation, and installed a mechanically attached 60-mil PVC roof with walk pads under a 20 year labor-and-materials warranty.
Read MoreWe removed the existing built-up roof and tile mansard. We installed a new ½ inch secure rock under a mechanically attached 60-mil PVC with a 20 year labor-and-materials warranty. This was a 17,500 square foot project and we used Kynar 24 gauge with ANSI Clete.
Read MoreWe roofed the Sheraton Hotel by the Sundial Bridge in 2017. It has a single-ply TPO roof of 45,000 square feet.
Read MoreWe completed a total reroof of all eleven buildings at Junction Elementary. It was a 70,000 square foot job, which we completed in under a month.
Read MoreShasta Community Health Center contracted Harbert Roofing throughout 2015 and 2016 to complete their single-ply roof of 15,000 square feet along with 12,000 square feet of metal siding.
Read MoreWe installed 7,000 square feet of single-ply and 2,000 squares of metal siding, amounting to a contract of $175,000.
Read MoreWe roofed these office building, consisting of single ply and RHEINZINK rain screen metal panels. The contract totaled to $310,000.
Read MoreCypress Plaza is a commercial multi-use center built in 2007. Harbert Roofing was responsible for supplying and installing a single-ply roof membrane, metal, subgrade waterproofing, and coping.
Read More